CHICAGO CIPP REHAB
Kenny Inliner was awarded a 5 year term agreement for Cured-In-Place rehabilitation of the City’s Sewer System. Kenny Inliner was selected for all three contracts offered by the City to rehab the system from the North to the Central and to the South over a period of five years.
The work consists of installing flexible tubes inverted into the existing sewer and catch basin laterals. This project includes various sizes of diameter pipe ranging from 8” to 48”. Throughout the five year contract with an option of an additional two years, our projected amount of 52,800 linear feet of pipe a year will need to be cleaned and lined.
Kenny Inliner constructed a new lining facility in Bedford Park, just below Midway Airport to service this major undertaking. The 44,000sf facility serves as the operations center and manufacturing facility impregnating the felt liners with custom resins and distributing them to Kenny Inliner crews throughout the City.
Kenny crews are spread throughout the City meeting the needs of the Department of Water Management to improve the system with minimal disruption to the public with this trenchless rehabilitation program. Working days in residential areas and nights in business areas, Kenny Inliner strives to keep the rehabilitation as minimally invasive to the public as possible.